BOILER TECH

WAS A BOILER TECH ON THE WADDELL 1200LB SUPERHEATED SIDE 72-74 RIGHT OUT BOOT CAMP. WAS IN VIETNAM WATERS 54 DAYS ON THE GUN LINE OPS END SWEEP CROSS THE EQAUTOR BECAME A SHELL BACK MANY OF SIGHTS AND SOUNDS. ALSO 74-75 WAS ON 600LB BOILER ON THE CORAL SEA WE WERE IN THE EVAC OF SAIGON AND RESCUE OF THE MAYAQUEZ. ONE OF THE HIGH LITES IF YOU WERE A NEW BOOT IN THE BOLIER ROOM YOU GREASED HEAD TO TOE.  ENJOYED ALL WHO SAILED HERE MISS THE OL SALTS.

You need to be a member of Navy Veterans to add comments!

Join Navy Veterans

Email me when people reply –